QM Bench

Cpk vs Cmk: what is the difference?

Short answer

Cmk (machine capability) judges the machine alone in a short, controlled run of usually 50 consecutive parts. Cpk (process capability) judges the full process, with material, operators, tool wear and shifts, over a longer period. Because the machine study excludes most sources of variation, its requirement is stricter: typically Cmk ≥ 1.67 versus Cpk ≥ 1.33.

Side by side

AspectCmk (machine capability)Cpk (process capability)
What it judgesThe machine or equipment aloneThe whole process: man, machine, material, method, environment
DataAbout 50 consecutive parts, one setup, one operator, one batch125 or more values in rational subgroups (e.g. 25 × 5) over days or weeks
Variation includedShort-term, machine onlyWithin-subgroup (Cpk) and total (Ppk) process variation
Typical requirementCmk ≥ 1.67 (often Cm ≥ 2.0)Cpk ≥ 1.33; Ppk ≥ 1.67 for initial process studies
WhenMachine acceptance (buy-off), after relocation or major repairPPAP, serial production, ongoing monitoring with SPC
Stability checkUsually not requiredRequired: control chart must show a stable process

Why Cmk must be higher than Cpk

A machine study removes most sources of variation on purpose: one material batch, one operator, a warm machine, no tool change. Whatever spread remains is only the machine. In real production every other factor adds variation, so the process spread will always be wider than the machine spread. If the machine already uses most of the tolerance, there is no room left for the rest. That is why customers ask for Cmk 1.67 or even 2.0 while accepting Cpk 1.33 for the process.

Same formula, different data

Both indices use the same idea: the distance from the mean to the nearer specification limit, divided by three standard deviations. The difference is in the data and in the standard deviation used. Cmk uses the overall standard deviation of a short consecutive run; Cpk uses the within-subgroup estimate (R̄/d₂ or s̄/c₄) from a stable process, and Ppk uses the overall standard deviation of the long-term data.

Practical sequence

Run a Type 1 gauge study first to make sure the measurement system is fit. Then do the machine capability study (Cmk) at the machine supplier or at installation. After the line is running, collect subgrouped data for the preliminary process capability (Ppk) and finally monitor the long-term Cpk with control charts.

Free tools for this