Try it while you read
Open the free A3 Report tool and click Load sample: it reproduces the case study below.
Theory: thinking on one sheet
The A3 report comes from Toyota, named after the paper size. It is less a form than a way of thinking: the author must understand the problem well enough to explain it on one page, and the page becomes the basis for discussion with the team and management. The left side describes the problem (background, current condition, goal, analysis), the right side the solution (countermeasures, follow-up, results).
A3 follows the PDCA cycle: Plan (sections 1 to 5), Do (implementing countermeasures), Check (follow-up and results), Act (standardise or start again).
Key point
Step by step
- Background: one paragraph on cost, customer impact or safety.
- Current condition: numbers and a chart, for example a Pareto of scrap.
- Goal: target value and date.
- Root cause: fishbone and 5 Why; note how each cause was verified.
- Countermeasures: one or more per root cause, with owner, date, status.
- Follow-up: what is checked, how often, by whom.
- Results: before and after, with charts or photos.
Case study: scrap on shaft line 3
The Load sample A3 shows a typical internal project.
- Background: scrap on line 3 cost 42,000 EUR in six months, twice the plant target; two customer complaints about oversize bearing seats.
- Current condition: scrap 3.8 % (target 1.5 %). Pareto: scratches 33 %, dents 21 %, wrong dimension 12 % but 45 % of the scrap cost. Cpk of the bearing seat 0.92.
- Goal: scrap below 1.5 % and Cpk ≥ 1.33 by 15 December.
- Root cause: offset not entered after insert change (verified by trial); scratches from parts touching in transport boxes (verified on one shift).
- Countermeasures: automatic probing, boxes with separators, SPC every 20 parts.
- Results: October 1.9 %, November weeks 1–2 1.3 %; Cpk 1.62.
Result
Common mistakes
- Writing the solution in the background section before the analysis.
- No numbers in the current condition.
- Countermeasures that do not link to a root cause.
Frequently asked questions
A3 or 8D?
Use 8D for customer complaints, where the customer expects that format and containment. Use A3 for internal improvements such as scrap, downtime or lead time, where there is no customer to protect but a business goal to reach.
Does it have to fit on one A3 sheet?
That is the idea: the format forces focus. The PDF from the tool is A4 portrait; for a wall display print it on A3.