Theory: counting instead of measuring

Not every quality characteristic is measured. Visual inspection, leak tests or functional checks give a count: good or bad, number of defects. Attribute control charts apply the same idea as variables charts, telling common-cause from special-cause variation, to such counts.

ChartCountsSample sizeDistribution
pproportion of defective unitsmay varybinomial
npnumber of defective unitsconstantbinomial
cnumber of defectsconstant area or unitPoisson
udefects per unitmay varyPoisson
p chart: CL = p̄,  UCL/LCL = p̄ ± 3 · √(p̄ (1 − p̄) / nᵢ)

With variable sample sizes the limits change from sample to sample: larger samples get narrower limits because their proportion is estimated more precisely. To apply run rules consistently, the tool standardises the points.

Key point

A defective unit can have several defects. Count units (p, np) when the decision is “ship or not”, count defects (c, u) when you want to track the defect level of complex products.

Step by step

  1. Choose the chart type with the table above.
  2. Collect 20 to 30 samples, one per shift, day or lot.
  3. Enter count and sample size in the table, one row per sample.
  4. Read the chart: points beyond the limits and run rules flag special causes.
  5. Act: investigate each signal and, once the cause is removed, exclude it to calculate the limits for ongoing control.

Case study: final inspection of housings

Final inspection records the number of rejected housings per shift and the number inspected, for 20 shifts (the Load sample p chart).

  • Average proportion defective p̄ = 5.99 %, upper limit about 11.1 %.
  • Sample 8 is at 15.1 %, above its upper control limit: a special cause.
  • All other shifts are between 3.8 % and 7.6 %, inside the limits.

The team finds that shift 8 ran with a new batch of castings with porosity. The batch is blocked, the supplier is informed through an 8D, and sample 8 is excluded when the limits are frozen. Because the remaining process still runs at about 6 % defective, a Pareto analysis of the defect types is started to reduce the level itself.

Result

Stability is restored by removing the batch cause; improvement of the 6 % base level is a separate project.

Common mistakes

  • Using an np chart with varying sample sizes.
  • Treating a stable chart as “good”: stable at 6 % defective is still 60,000 PPM.
  • Recalculating the limits every week, which hides gradual deterioration.

Frequently asked questions

p chart or np chart?

Both count defective units. The np chart plots the number and needs a constant sample size; the p chart plots the proportion and also works with variable sample sizes.

Can attribute charts replace a capability study?

They show stability and the average defect level, which can be converted to PPM. They are less sensitive than variables charts, so measured characteristics should use X-bar/R or I-MR charts where possible.