| Measure | Value |
|---|---|
| PPM, two-sided, centred | 24,449 |
| PPM, one side only | 12,224 |
| Yield (two-sided) | 97.55511 % |
| Sigma level Z = 3 · Cpk | 2.25 |
| Long-term PPM with 1.5 σ shift | 226,716 |
| Distance mean to nearest limit | 2.25 σ |
What Cpk 0.75 means
Cpk compares the distance between the process mean and the nearest specification limit with three standard deviations. At Cpk 0.75 the nearest limit is 2.25 standard deviations away from the mean. The PPM values above assume a normal distribution and a stable process; for skewed data use a fitted distribution in the capability study.
The process does not fit the tolerance: defects are certain. Not acceptable for production without sorting. Remember that a Cpk calculated from a small sample is uncertain: with 30 values the 95 % confidence interval is roughly ±0.4. Plan the number of parts with the sample size calculator.
Compare with other values
Cpk 0.67Cpk 0.80Convert any value · What is a good Cpk?
Frequently asked questions
How many PPM is Cpk 0.75?
For a normal, stable process centred between two specification limits, Cpk 0.75 corresponds to 24,449 PPM (defects outside both limits). If only one limit matters or the process sits at one side, it is 12,224 PPM.
What sigma level is Cpk 0.75?
Z = 3 × Cpk = 2.25. With the Six Sigma 1.5 sigma long-term shift, the expected long-term defect rate is about 226,716 PPM.
Is Cpk 0.75 good?
The process does not fit the tolerance: defects are certain. Not acceptable for production without sorting.