QM BenchQuality engineering tools

Production

High scrap and rework: which quality tools to use

Scrap or rework is above target, often spread over several defect types.

Start with

Supporting methods

First steps

  1. Collect 4 weeks of scrap data by defect type, station and shift.
  2. Pareto by cost, not only by count.
  3. Pick the top defect, check the gauge, then analyse causes with data.

How to measure success

Scrap rate (%) and scrap cost per month. Record the value before you start, so the effect of every action can be shown.

When these methods are the wrong choice

  • Pareto chart: A single defect type with one known cause.
  • Ishikawa (fishbone): Proving a cause; it only lists candidates to verify.
  • SPC control charts: Characteristics without a capable gauge or with too few data.
  • Cost of poor quality (COPQ): Root cause analysis.
  • FPY / RTY: Field failures.
  • MSA / Gage R&R: Nothing: do it before you trust any data.
  • A3 report: Formal customer complaints that require an 8D form.

The methods in one line

MethodWhat it is
Pareto chartRanks defect types or causes so the team works on the vital few first.
Ishikawa (fishbone)Structured brainstorm of possible causes by 6M: man, machine, method, material, measurement, environment.
SPC control chartsSeparates common-cause from special-cause variation and tells the operator when to react.
Cost of poor quality (COPQ)Puts a money value on scrap, rework, sorting, warranty and complaints to set priorities.
FPY / RTYFirst pass yield per step and rolled throughput yield of the whole line.
MSA / Gage R&RChecks that the measurement system can see the variation you want to control.
A3 reportOne-page PDCA story: background, current state, root cause, countermeasures, follow-up.

Other problems in Production

Open the interactive tool selector