Machine downtime and low OEE: which quality tools to use

Planned output is not reached; machines stop often or run slowly.

Start with

Supporting methods

First steps

  1. Record stops with reason codes for 2 to 4 weeks.
  2. OEE by machine, Pareto of stop minutes.
  3. Attack the top loss with a small team.

How to measure success

OEE (%), MTBF and MTTR. Record the value before you start, so the effect of every action can be shown.

When these methods are the wrong choice

  • OEE analysis: Manual processes without a machine cycle.
  • Pareto chart: A single defect type with one known cause.
  • TPM: One-off breakdowns with a known cause.
  • SMED: Lines that rarely change over.
  • 5 Why: Problems with many interacting causes; use data and DOE there.
  • 5S: Process capability problems.

The methods in one line

MethodWhat it is
OEE analysisSplits equipment losses into availability, performance and quality to show where time is lost.
Pareto chartRanks defect types or causes so the team works on the vital few first.
TPMTotal productive maintenance: operator care, planned maintenance and loss elimination.
SMEDShortens changeovers by moving work outside the machine stop and simplifying the rest.
5 WhyAsk “why” until you reach a cause you can act on, with one chain for occurrence and one for escape.
5SWorkplace organisation: sort, set in order, shine, standardise, sustain.