Missing or wrong parts at the line: which quality tools to use

Line stops because a part is missing, or a wrong variant is delivered.

Start with

Supporting methods

Value stream mapping

Information flow from plan to line.

Standard work / work instructionFree tool

Picking standard.

Open the tool

First steps

  1. Count stops by cause for two weeks.
  2. Label and fix locations.
  3. Add a scan or check at the point of use.

How to measure success

Line stops due to material. Record the value before you start, so the effect of every action can be shown.

When these methods are the wrong choice

  • Kanban / pull: Very irregular, one-off demand.
  • 5S: Process capability problems.
  • Poka-yoke: Causes in the material or the supplier’s process.
  • Value stream mapping: A problem at one machine.
  • Standard work / work instruction: Processes that are still changing every week.

The methods in one line

MethodWhat it is
Kanban / pullReplenishes material by actual consumption with cards or signals and fixed limits.
5SWorkplace organisation: sort, set in order, shine, standardise, sustain.
Poka-yokeMakes the error impossible or detects it immediately, so it does not depend on attention.
Value stream mappingMaps material and information flow end to end and shows waiting, inventory and lead time.
Standard work / work instructionThe current best way to do a job, with key points and reasons, used for training and audits.