QM Bench

Checklist de auditoría interna IATF 16949 en línea

Califique los requisitos automotrices, registre evidencias y genere el reporte. ↓

  1. 1Ingresar datos
  2. 2Leer el veredicto
  3. 3Descargar el reporte PDF

Nota: la interfaz de la herramienta está por ahora en inglés; la versión en español llegará pronto.

Saved in this browser

Rate each requirement. Minor or major opens fields for evidence, the finding and the corrective action. Click a selected rating again to clear it.

4–5 Context and leadership

  • 4.3.2

    Customer-specific requirements are listed, evaluated and included in the scope of the quality system.

  • 4.4.1.2

    Product safety process is defined: identification of safety-related characteristics, approvals and escalation.

  • 5.1.1.1

    Corporate responsibility policies (anti-bribery, conduct, ethics escalation) are in place.

  • 5.3.1

    Responsibility for customer requirements, special characteristics and quality objectives is assigned.

6 Planning

  • 6.1.2.3

    Contingency plans exist for key equipment, supply, utilities, IT and labour, and are tested.

  • 6.2.2.1

    Quality objectives cover customer requirements and are deployed to functions and levels.

7 Support

  • 7.1.3.1

    Plant, facility and equipment planning uses a multidisciplinary approach and lean principles.

  • 7.1.5.1.1

    MSA studies are done for every measurement system named in the control plan.

  • 7.1.5.2.1

    Calibration records include out-of-calibration evaluation and customer notification when needed.

  • 7.1.5.3

    Internal and external laboratories have a defined scope and are qualified.

  • 7.2.3

    Internal auditors are qualified, including core tools and customer-specific requirements.

  • 7.2.2

    On-the-job training is given for new or changed jobs, including contract staff.

8.3 Product and process design

  • 8.3.2.1

    Product realisation uses a multidisciplinary approach (APQP or the customer's method).

  • 8.3.3.3

    Special characteristics are identified and carried through FMEA, control plan and work instructions.

  • 8.3.4.4

    Product approval (PPAP or the customer's method) is done before shipment.

  • 8.3.5.2

    Process design outputs include process FMEA, control plan, instructions and capability studies.

8.4 Supplier management

  • 8.4.1.2

    Supplier selection includes risk to product quality and delivery, and quality system assessment.

  • 8.4.2.4

    Supplier performance (quality, delivery, customer disruptions) is monitored.

  • 8.4.2.5

    Supplier development is prioritised by performance and risk.

8.5 Production

  • 8.5.1.1

    Control plans exist for pre-launch and production, and are reviewed after changes or quality issues.

  • 8.5.1.3

    Job set-up is verified (first-off / last-off) and recorded.

  • 8.5.1.5

    Total productive maintenance: preventive and predictive maintenance, spare parts, objectives.

  • 8.5.6.1

    Process changes are evaluated, verified and, where required, approved by the customer.

  • 8.5.6.1.1

    Temporary changes of process controls are approved, recorded and verified at restart.

8.6–8.7 Release and nonconforming product

  • 8.6.2

    Layout inspection and functional testing are done per control plan.

  • 8.6.4

    Incoming product quality is verified by one or more defined methods.

  • 8.7.1.4

    Rework and repair are controlled with instructions, risk assessment and re-inspection.

  • 8.7.1.7

    Nonconforming product disposition (scrap) is controlled and rendered unusable.

9 Performance evaluation

  • 9.1.1.1

    Manufacturing processes are monitored with capability studies and SPC as required.

  • 9.1.2.1

    Customer scorecards and portals are monitored and acted on.

  • 9.2.2.2

    Quality system audits cover all processes over three years, including customer-specific requirements.

  • 9.2.2.3

    Manufacturing process audits cover all processes and shifts over three years.

  • 9.2.2.4

    Product audits are done at appropriate stages to verify conformity.

10 Improvement

  • 10.2.3

    A documented problem-solving process exists (e.g. 8D), with containment, root cause and verification.

  • 10.2.4

    Error-proofing is used where appropriate and is tested for failure.

  • 10.2.5

    Warranty management includes analysis of field returns, including no-trouble-found.

  • 10.3.1

    Continual improvement process is documented and applied to manufacturing processes.

Photos (evidence)

Checklist de auditoría interna IATF 16949

Audite los requisitos automotrices de IATF 16949 con un checklist sobre requisitos específicos del cliente, seguridad del producto, MSA, planes de control, características especiales, TPM, solución de problemas y dispositivos a prueba de errores.

Complementa el checklist ISO 9001 y ayuda a preparar la auditoría de certificación.

Cómo funciona

Agregue los requisitos específicos de sus clientes como preguntas y siga una pieza desde el plano por el AMEF y el plan de control hasta la instrucción y el estudio MSA.

El dashboard muestra la conformidad por grupo de capítulos y las acciones abiertas.

Cuándo usarla

Úselo en las auditorías de sistema (9.2.2.2), antes de la certificación y cuando cambian los requisitos del cliente.

Reporte PDF en un clic

El reporte IATF se exporta en PDF con resultado, dashboard, hallazgos, acciones y checklist con números de capítulo.

Privado: todo se ejecuta en su navegador

Todo se calcula y se guarda en su navegador. Contenidos, números de parte y fotos no se suben a ningún servidor. Sin registro ni instalación; puede descargar una copia de seguridad de todos sus datos cuando quiera.

Preguntas frecuentes

¿Qué tres tipos de auditoría exige IATF 16949?

De sistema, de proceso de manufactura y de producto.

¿Qué formación necesitan los auditores internos?

Enfoque a procesos, requisitos del cliente, ISO 9001, IATF 16949 y core tools.

¿Puedo agregar preguntas?

Sí, con “Edit checklist”.

Guía detallada con caso práctico (en inglés)→