Excel template
Value Stream Mapping Tool
Type the process data once and Excel draws the current and future state map, finds the bottleneck against takt and shows how much lead time the kaizen removes
Launch offer: −20 %(€15.92 instead of €19.90)with code LAUNCH20 at checkout, until 30 November.
Value stream mapping workbook: enter demand, shifts and up to 12 process steps with cycle time, changeover, uptime, operators, stations, batch, inventory, flow and value-added time. The current state map is drawn by formulas with supplier, production control, customer, process boxes, inventory triangles, flow arrows and the lead time ladder. Type only what changes for the future state map with kaizen bursts; line balance, lead time, a 13-metric comparison and a 30-row kaizen plan follow. Example and blank file, no macros, no Visio.
- Current state map drawn by formulas: change a number and the map redraws, no Visio or drawing
- Takt time from demand and shifts; effective cycle time with uptime and parallel stations finds the bottleneck
- Inventory converted to days of demand: lead time ladder, production lead time, processing time and PCE
- Future state: type only what changes, remove steps, set FIFO, supermarket or continuous flow; open kaizen actions show as bursts
- EPEI per step, operators needed vs operators today, bottleneck capacity per day
- 13 metrics current vs future and a 30-row kaizen plan with days late; example and blank file, no macros
| What you get | Free demo | Full · €19.90 |
|---|---|---|
| Every sheet, dashboard and chart | ||
| Example data with real results | ||
| Enter your own data | ||
| Formulas recalculate automatically | ||
| Blank file for your next project | ||
| Your own reports for customers and audits |
Need more than one? All premium templates for €129 (€332 separately) · Adapted to your form from €49
Secure checkout by Polar. Digital download: at checkout you agree to immediate delivery and waive the 14-day withdrawal right, so downloads are not refunded. Support: info@qmbench.com.
Free alternativeTry the free online tool firstThe free Value Stream Map on QM Bench runs in your browser with a PDF report. The template is for a file you keep, edit and fill with your own data.Open the free toolWhat is inside
- 1
Start Here
What each tab does, how the numbers are calculated and how to adapt the file.
- 2
Process Data
Demand, working days, shifts, breaks → takt; value stream information; up to 12 steps with CT, C/O, uptime, operators, stations, batch, part numbers, inventory, flow and VA time; row check.
- 3
Current Map
The current state VSM: supplier, production control, customer, process boxes, inventory, flow arrows, lead time ladder and summary.
- 4
Future Data
Only the changes: blank = same as today, remove a step, change the flow, cut inventory; live check of lead time, inventory and bottleneck while you type.
- 5
Future Map
The future state VSM with kaizen bursts for open actions.
- 6
Line Balance
Effective CT vs takt per step, current and future, status, capacity per day and a chart.
- 7
Lead Time
Inventory before each step in pieces and days, current vs future, EPEI and a chart.
- 8
Comparison
13 metrics current vs future with change, % and the right direction of improvement, plus a chart.
- 9
Kaizen Plan
30 actions: step, waste, action, expected result, owner, target and done date, status and days late.

A map without drawing
Walk the process, type the numbers in one sheet and the current state map builds itself: process boxes with cycle time, changeover, uptime, operators, batch and EPEI, inventory triangles in pieces and days, push, FIFO, supermarket or continuous flow, and the lead time ladder under the boxes.

The bottleneck against takt
Takt time comes from demand and the available time. Effective cycle time divides cycle time by uptime and parallel stations, so a step with good cycle time but poor uptime still shows up. Every box is marked OK, near takt (90 % and more) or bottleneck.

Future state in minutes
On Future Data you type only what the kaizen changes: SMED, a second cell, smaller batches, a FIFO lane or a supermarket. Blank cells keep today's value, and a live check shows the new lead time, inventory and bottleneck while you type.

Ready for the kaizen workshop
The comparison judges 13 metrics in the right direction (lower lead time, higher PCE, fewer bottlenecks), the kaizen plan tracks owner, dates and days late, and both maps print on one A3 or Tabloid page for the wall.
Who it is for
- Lean, CI and industrial engineers preparing a VSM workshop
- Production and plant managers who want lead time and inventory in numbers
- Quality and operations teams in automotive, metal, plastics and assembly plants
- Lean Six Sigma Green and Black Belt projects
Not included
- Not a drawing tool: the map layout is fixed (one row of up to 12 steps), no free shapes or parallel branches
- Information flow is shown as text boxes, not as drawn electronic or manual arrows
- Not a simulation: the numbers are steady-state averages from your data
Details
- Format
- Microsoft Excel .xlsx, 2 files (example + blank), 9 tabs
- Works in
- Excel 2010 or newer, Microsoft 365, Excel for Mac, LibreOffice Calc
- Macros
- None, no VBA, no passwords
- Capacity
- 12 process steps, 30 kaizen actions, 13 compared metrics
- Each map on one A3 / Tabloid page, landscape
Frequently asked questions
›Where do I buy it?
Here on QM Bench with the Buy button: secure card checkout by Polar with a receipt, and both Excel files arrive by e-mail right after payment.
›Is there a free version?
Yes. The free online value stream map on QM Bench draws a current state map in your browser with a PDF. The Excel tool adds the future state with only the changes, line balance, lead time and EPEI analysis, the 13-metric comparison and the kaizen plan in a file you keep.
›Do I need Visio or any add-in?
No. Everything is built with normal Excel formulas and formatting. There are no macros, no add-ins and no passwords.
›How many process steps can I map?
Up to 12 steps in flow order. Leave unused rows empty and the maps shrink. For a longer value stream, map one loop per file or combine steps.
›How is PCE calculated?
Process cycle efficiency = value-added seconds ÷ production lead time in available working seconds. Batch-and-queue plants are often below 1 %; what counts is the change from the current to the future state.
›Can I get a refund?
No. It is a digital download: at checkout you agree to immediate delivery and waive the 14-day right of withdrawal, and the files stay with you. If something does not work, write to info@qmbench.com and we fix it.
Get the Value Stream Mapping Tool
The Excel files arrive by e-mail right after payment. No macros, nothing locked: open the example, then fill the blank file with your own data.
Buy now · €19.90Or try the free online tool first →