The eight wastes
Lean looks at a process through the eyes of the customer: only work that changes the product in a way the customer pays for adds value. Everything else is either necessary for now (inspection, some transport) or waste. The eight wastes are often remembered as TIMWOODS:
- Transport: moving material without adding value
- Inventory: material waiting between steps
- Motion: walking, reaching, searching
- Waiting: people or machines waiting for material, information or a decision
- Overproduction: making more or earlier than needed, the waste that hides all others
- Overprocessing: more work or precision than the customer needs
- Defects: scrap, rework, sorting and complaints
- Skills: not using the ideas and knowledge of the people
Where to start
Start with the pace: calculate takt time and compare it with what each station really needs. The Yamazumi chart shows which stations are overloaded and how much of their time is waste. Then look at the losses at the bottleneck with OEE, shorten the changeovers that force large batches with SMED, and connect the processes with kanban instead of schedules pushed from the office.
Every improvement ends in a standard: a work instruction for the new sequence, a 5S standard for the workplace and a short audit that checks both. Without the standard, the line drifts back within weeks.
Lean and Six Sigma
Lean removes waste and speeds up flow; Six Sigma reduces variation and defects with data. Most plants use both: lean to see and remove the obvious waste quickly, Six Sigma when a problem needs statistics to find its cause. See the Six Sigma hub for the DMAIC roadmap.