What a CQI assessment is
A CQI special process assessment is a structured self-audit of one manufacturing technology. Each manual has the same basic structure: questions on the management system around the process, questions on the shop floor and material handling, questions on the equipment, a job audit that follows one real order, and process tables. The process tables say which parameters to monitor, how often, and which tests to run on the parts, for each variant of the process.
Every item is rated as satisfactory, not satisfactory, needs immediate action or not applicable. There is no points score: every gap needs its own corrective action.
Who requires it
IATF 16949 does not name the CQI manuals. The requirement comes from the customers: several automotive OEMs, especially in North America, ask in their customer-specific requirements that each supplier using a special process runs the matching CQI assessment, and that it flows the requirement down to its own special process suppliers. Other customers and tier 1 suppliers adopt the same approach in their supplier manuals. Read the current customer-specific requirements of each customer to know whether, which edition, and how.
How often
The common rule is a self-assessment once a year, plus a new assessment when the process changes significantly (new equipment, new location, new process variant) or after a serious quality problem. Some customers set their own interval, or require an assessment by their own or a third-party assessor. The results and the action plan should be ready for review by the customer and by the IATF certification body.
How to run one in six steps
- Get the current manual. Buy the current edition of the AIAG manual for your process and read the customer-specific requirements; they decide the edition, the interval and who may assess.
- Name a qualified assessor. Someone who knows the process and the manual. Many customers expect formal training and, for some processes, a minimum of experience.
- Assess on the shop floor. Go through the system questions with evidence, then the job audit: follow one real order from receipt to shipment and compare it with the requirements.
- Check the process tables. For every process in use, compare monitoring and test frequencies with the tables, and use the stricter value where the customer specification differs.
- Rate and plan actions. Rate each item. Every not satisfactory item gets a corrective action with owner and due date; an item that needs immediate action gets containment first.
- Keep it and repeat. Keep the report and evidence ready for customer and IATF auditors and repeat the assessment at the required interval or after major changes.
How it fits IATF 16949 and supplier audits
| Requirement | Link to the CQI assessment |
|---|---|
| IATF 16949, 4.3.2 | Customer-specific requirements must be evaluated and included in the quality management system. This is where most CQI requirements come from. |
| IATF 16949, 8.3 | Manufacturing process design: process FMEA, control plan, process specifications and capability for the special process are designed and checked during development. |
| ISO 9001 / IATF 16949, 8.5.1 | Control of production, including validation and periodic revalidation of processes whose result cannot be fully verified afterwards. Heat treatment, plating, coating, welding, molding and casting are classic examples. |
| IATF 16949, 8.5.1.1 to 8.5.1.5 | Control plan, standardised work, verification after job set-up and shutdown, and total productive maintenance: all checked in detail by a CQI assessment. |
| IATF 16949, 8.4 | Supplier control: flow the CQI requirement down to sub-tier special process suppliers and verify it, for example by asking for their self-assessment or with a second-party audit. |
For a supplier quality engineer the CQI assessment is a strong input to supplier selection and monitoring. Ask a special process supplier for its latest self-assessment and the status of the actions before you approve it, and focus your own process audit or capability assessment on the items it rated weakest. For the full supplier life cycle see the supplier quality hub.