QM BenchQuality engineering tools

Muda (eight wastes)

activities that add no value

Muda is the Japanese word for waste: everything the customer does not pay for. Lean usually names eight wastes, remembered as TIMWOODS: transport, inventory, motion, waiting, overproduction, overprocessing, defects and skills not used.

Lean also names mura (unevenness) and muri (overburden). Uneven demand and overloaded people or machines create waste, so levelling the work is as important as removing the waste itself.

Examples on the shop floor

  • Transport: forklift moves between two buildings.
  • Inventory: full racks in front of every machine.
  • Motion: walking to the tool cart, searching for screws.
  • Waiting: operator watches the machine cycle.
  • Overproduction: building to forecast instead of orders.
  • Overprocessing: tighter tolerance than the function needs.
  • Defects: scrap, rework, sorting.
  • Skills: ideas of operators never asked for.

Calculate it

Takt Time and Line Balancing (Yamazumi): Takt, bottleneck, balance efficiency and a Yamazumi chart per station.

Related terms