map of material and information flow

Value-added ratio = value-adding time ÷ lead time

A value stream map draws all steps from raw material to the customer for one product family, with process data (cycle time, changeover, uptime), stock between the steps and the information flow from the customer order to the shop floor. A timeline at the bottom compares the value-adding time with the total lead time.

The current-state map shows where material waits; the future-state map shows the target with flow, pull and a pacemaker process scheduled to takt.

Calculate it

Takt Time and Line Balancing (Yamazumi): Takt, bottleneck, balance efficiency and a Yamazumi chart per station.

Related terms