QM BenchQuality engineering tools

How many kanban cards? Formula, example and loop design

The kanban formula explained term by term, how to measure replenishment lead time, how to choose container size and safety factor, and a supermarket case study with five parts.

Ľubomír Blažek
Process quality team leader, automotive · updated 2026-11-14

Try it while you read

Open the free Kanban Calculator tool and click Load sample: it reproduces the case study below.

Open the tool

Theory: the Toyota formula

N = D × (L + R) × (1 + α) ÷ C

The loop must hold enough material to cover consumption while a card travels back and forth: demand D per day times the replenishment lead time L plus the collection interval R. A safety factor α covers normal variation. Dividing by the container quantity C and rounding up gives the number of cards.

The maximum stock is N × C. Divided by daily demand it gives the days of coverage, a number managers understand at once.

Key point

The number of cards is a lever, not a constant. Shorter lead times, more frequent collection and smaller containers all reduce it. Every card removed from a stable loop is stock that no longer has to be financed, stored and counted.

Step by step

  1. Take the average daily demand from the customer schedule.
  2. Measure the replenishment lead time from card release to the full container back at the point of use.
  3. Set the collection interval, for example twice per shift.
  4. Choose a safety factor of 10 to 20 % and the container size.
  5. Read the cards, stock and coverage per part; follow up the notes.
  6. Print the cards, start the loop and review it weekly.

Case study: line-side supermarket

An assembly line uses five purchased and in-house parts (the Load sample). The housing is made in the moulding shop one day away; screws come from a supplier with three days lead time.

  • Housing: 880 a day, 1 day lead time, a quarter day collection interval, 10 % safety and 40 per box: 31 cards, 1.4 days of stock.
  • Seal kit: 5 days lead time and 500 per box: the long lead time dominates and drives the stock to over 7 days.
  • Screws: 4 boxes of 5,000 hold 20,000 pieces, almost 6 days of demand, because the box is large.

The team asks the seal kit supplier for weekly call-offs with a two-day lead time and smaller boxes for screws. The supermarket shrinks by a third without a single stock-out. Shorter changeovers in the moulding shop, analysed with the SMED tool, are the next step for the housing loop.

Common mistakes

  • Counting only the processing time as lead time.
  • One card per part: the loop stops while the card is away.
  • Never recalculating after a demand change.
  • Hiding unreliable deliveries with a large safety factor.

Frequently asked questions

Is the formula the same for production and withdrawal kanban?

Yes. For a production kanban the lead time includes the queue at the producing process, its changeover and the production time; for a withdrawal kanban it is mainly the transport loop.

What if demand is seasonal?

Recalculate the loop when the average demand changes noticeably, for example monthly, and add or remove cards. Keep the extra cards in a controlled place, not in the loop.