QM BenchQuality engineering tools

Little’s law

WIP, throughput and lead time

Lead time = WIP ÷ throughput

Little’s law states that in a stable system the average lead time equals the average work in progress divided by the average throughput. It holds regardless of the details of the process.

For lean it means: with the same output, the only way to shorten lead time is to reduce work in progress. That is why pull systems cap the stock between processes.

Calculate it

Kanban Calculator: Number of kanban cards, maximum stock and days of coverage per part.

Related terms

  • Lead time: time from order or start to delivery
  • Kanban: card signal for pull replenishment