Inspection plan builder with automatic checks
Build the inspection plan of a part in the browser: every characteristic with its limits and class, the gauge and its resolution, the inspection stage, frequency, sample size, whether results are recorded, and the reaction plan.
The tool checks the plan against the rules auditors ask about first: gauge resolution of at least a tenth of the tolerance, recorded results for special characteristics, and a reaction plan for every check.
Worked example: Inspection Plan Builder
- 01List6 characteristics2 CC, 1 SC
- 02Gaugesresolution≤ 1/10 of tolerance
- 03Check2 gapscaliper too coarse, leak test not recorded
- 04Fixplan completeprint for the station
01Method
A characteristic is flagged when the gauge or method is missing, the resolution is coarser than 1/10 of the tolerance (LSL to USL), the frequency or sample size is missing, a CC or SC characteristic has no recorded results, or there is no reaction plan.
Missing items for special characteristics count as gaps; for standard characteristics a missing reaction plan or resolution is shown as a point to check.
02When to use it
Use it when a new part goes into production, when the control plan changes, to prepare incoming or final inspection instructions, and before an audit to find gaps in gauges and reaction plans.
PDF report in one click
Export a landscape PDF with the full plan and the list of findings, ready for the inspection station.
Private: runs in your browser
The plan stays in your browser. Nothing is uploaded.
How to build an inspection plan
- List the characteristics from the drawing and the control plan, with their limits.
- Mark special characteristics (CC, SC) as agreed with the customer.
- Choose the gauge with a resolution of at least 1/10 of the tolerance.
- Set stage, frequency and sample size from the risk and the process capability.
- Write the reaction plan: what the operator or inspector does when a result is out.
- Fix the gaps the tool lists, then print the plan for the station.
Derive the plan from the control plan, prove the gauges with a Gage R&R or an uncertainty budget, and choose lot sample sizes with the AQL calculator. All tools: quality inspection.
Frequently asked questions
›What is the difference between an inspection plan and a control plan?
A control plan covers all controls of the process, including process parameters, error-proofing and reaction plans. An inspection plan is the part that describes the product checks: what is inspected, where, with which gauge, how often and how many. In many plants the inspection plan is derived from the control plan.
›What is the 10:1 rule?
The gauge should resolve at least one tenth of the tolerance. A caliper with 0.01 mm resolution is enough for a ±0.1 mm tolerance, but not for ±0.01 mm. The rule is a minimum; the measurement system still needs a Gage R&R or uncertainty study.
›Why do special characteristics need recorded results?
Results of CC and SC characteristics are evidence for the customer and must be traceable. IATF 16949 and most customer requirements ask for recorded results and often for SPC on these characteristics.
›How do I choose the frequency?
From the risk and the stability of the process: capable and stable processes can be checked less often, special characteristics and unstable processes more often. The FMEA and the capability study are the inputs.