Six Sigma project charter template online
Fill in the project charter in the browser: problem statement, business case, goal, scope, team, DMAIC milestones and the financial benefit, and print it for the sponsor’s signature.
Nine checks tell you what is missing before sign-off: a measurable problem without a cause or solution, a goal with baseline, target and date, scope in and out, named sponsor and lead, ordered milestones and an estimated benefit.
Worked example: Six Sigma Project Charter
- 01Problem4.2 % failsince March, line 3
- 02Goal1.0 % by Decsame metric
- 03Benefit€57,600 / year400,000 units × €4.50
- 04Check9 of 9ready for sign-off
01Method
Yearly saving = (baseline − target) × volume per year × cost per failed unit (for a percentage metric the difference is divided by 100). Payback = one-off cost ÷ yearly saving.
PDF report in one click
Export a PDF with the full charter, the checks and signature lines.
Private: runs in your browser
All data stays in your browser. Nothing is uploaded and no account is needed.
How to write the charter
- Describe the problem in numbers, without cause or solution.
- Set the goal with the same metric, a baseline, a target and a date.
- Draw the boundaries: what is in scope and, just as important, what is not.
- Name the team, the sponsor and the dates of the five tollgates.
- Estimate the benefit and fix everything the check lists before sign-off.
Next steps in Define: a SIPOC and the CTQ tree; the full roadmap is in DMAIC step by step and the Six Sigma hub.
Frequently asked questions
›What belongs in a project charter?
A problem statement, the business case, a measurable goal with baseline, target and date, the scope (in and out), the team with sponsor and project lead, milestones for the DMAIC phases and the expected benefit.
›How do I write a good problem statement?
Say what, where, since when and how big, in numbers, without naming a cause or a solution. For example: “Since March, 4.2 % of housings from line 3 fail the leak test, costing €18,000 a month.”
›How are the savings calculated?
Improvement of the metric times the yearly volume times the cost per failed unit. Separate hard savings that reduce spending from soft savings such as freed capacity, and let controlling confirm them.
›Who signs the charter?
The sponsor, usually the manager who owns the process or the problem, together with the project lead. Signing means agreeing on the goal, the scope and the resources.