DMAIC is the five-phase roadmap of Six Sigma for improving a process that already exists. Its strength is discipline: no solution before the problem is measured, no action before the cause is proven, and no project closed before the gain is secured. Each phase ends with a short review (a tollgate) with the sponsor.

The five phases, deliverables and tools

PhaseDeliverables at the tollgateFree tools
DefineProblem statement, goal with baseline and target, scope, team, savings estimate, signed charter.SIPOC, COPQ, Pareto
MeasureOperational definitions, validated measurement system, baseline capability or yield, data collection plan.Gage R&R, Attribute agreement, Capability, FPY
AnalyzePossible causes collected, narrowed with data, root causes verified statistically or by switching them on and off.Fishbone, IS / IS NOT, Multi-vari, Hypothesis tests, Regression
ImproveSolutions or optimal settings found, risks assessed, pilot run with data before and after.DOE, FMEA, Sample size and power
ControlControl plan, control charts, standardised work, training, handover to the process owner, savings confirmed.Control plan, Control charts, LPA, Work instruction

Define: a charter that can be measured

A good problem statement says what, where, since when and how big, in numbers, without naming a cause or a solution: “Since March, 4.2 % of housings from line 3 fail the leak test, costing €18,000 a month.” The goal uses the same unit with a baseline, a target and a date.

Measure: trust the data first

Before the baseline, check the measurement system. A leak tester with a %GRR of 40 % produces noise, and any analysis on its data is wasted. Then measure the baseline long enough to see the normal variation, for example two to four weeks.

Analyze: prove the cause

Collect possible causes with the team, then narrow them with facts and data: where and when the problem occurs and where not, which family of variation dominates, which factors differ significantly. A cause is verified when switching it on and off switches the problem on and off.

Improve: test before rolling out

Find the solution or the settings, assess the new risks, and run a pilot. Compare before and after with a hypothesis test and check that the sample was large enough to see the difference you expect.

Control: make it last

Update the control plan and the work instructions, put the key input or output on a control chart with a reaction plan, train the people and hand the process back to its owner. Confirm the savings after a few months.