QM BenchQuality engineering tools

Supplier scorecard: KPIs, weights and A / B / C classes

How to build a supplier scorecard that suppliers accept: which KPIs to use, how to turn PPM, on-time delivery and 8D speed into points, weights, classes and a monthly one-page report, with a worked example.

What a supplier scorecard is for

A supplier scorecard turns delivery and quality data into one score and a class per supplier every month. It is the basis for the monthly review with the supplier, for sourcing decisions and for escalation. IATF 16949 clause 8.4.2.4 asks for supplier performance monitoring with at least delivered product quality, customer disruptions, delivery schedule performance and premium freight; a scorecard covers these in one place.

The six KPIs that work

KPIHow it is measuredTypical A limit / B limit
PPMRejected parts ÷ received parts × 1,000,000≤ 50 / ≤ 250
On-time deliveryDeliveries on time and complete ÷ deliveries due≥ 98 % / ≥ 92 %
Complaints per monthOfficial complaints (SCAR) in the period ÷ months0 / ≤ 1
Containment time (D3)Days from complaint to containment in place≤ 1 / ≤ 3 days
8D closure time (D8)Days from complaint to 8D closed≤ 30 / ≤ 60 days
Quality cost per monthSorting, rework, scrap and administration charged to the supplier0 / ≤ 1,500

From KPI to points

Give each KPI points by band instead of a continuous formula: 100 points when it meets the A limit, 60 when it meets the B limit, 20 below. Bands are easy to explain to a supplier and stop arguments about the third decimal. A month without deliveries should not count as perfect: leave the KPI empty and let the weights of the other KPIs carry the score.

Weights and classes

  • Quality first: PPM 30 %, complaints 15 %, D3 15 %, D8 10 %.
  • Delivery: on-time delivery 25 %.
  • Cost: quality cost 5 %.
  • Score = Σ points × weight. Class A from 85, B from 65, C below.
  • Switch a KPI off by setting its weight to 0 % and re-balance the others to 100 %.

Worked example

KPIYTD valueRatingPoints × weight
PPM847C (above 250)20 × 30 % = 6.0
On-time delivery92.4 %B60 × 25 % = 15.0
Complaints / month2.3C20 × 15 % = 3.0
D3 days4.3C20 × 15 % = 3.0
D8 days54.8B60 × 10 % = 6.0
Quality cost / month2,890C20 × 5 % = 1.0
TotalClass C34.0

What each class triggers

  • A: preferred supplier, eligible for new business, reduced incoming inspection.
  • B: improvement plan for the KPIs below the A limit, reviewed monthly.
  • C: escalation, quality meeting with the supplier management, increased inspection or controlled shipping, no new business until back to B.

Make it fair and repeatable

  • Agree the definitions in the supplier quality agreement: which rejects count, the delivery window, when the D3 / D8 clock starts.
  • Send the one-page scorecard every month, not once a year.
  • Rank all suppliers for the same period so the review focuses on the worst ten.
  • Keep the raw logs (receipts, deliveries, complaints): the score must be traceable to records.
Excel templateSupplier Quality Bundle · €36.99Supplier Scorecard + Supplier Selection & Capability: choose suppliers with facts, then rate them monthly A / B / CSee the template →

Written by Ľubomír Blažek, process quality team leader, automotive. Standards are summarised in our own words; use the official publications for formal work.