Late supplier deliveries: which quality tools to use

Parts arrive late or incomplete and production plans change at short notice.

Start with

Supporting methods

8D reportFree tool

Root cause for repeated delivery failures.

Open the tool
Value stream mapping

See the whole supply chain lead time.

First steps

  1. Measure OTD by supplier.
  2. Check capacity against demand.
  3. Agree a pull system and safety stock.

How to measure success

OTD (%) and premium freight cost. Record the value before you start, so the effect of every action can be shown.

When these methods are the wrong choice

  • Supplier scorecard: Selecting a new supplier.
  • Run at rate: Quality problems without a capacity question.
  • Kanban / pull: Very irregular, one-off demand.
  • 8D report: Small internal issues where one person can fix the cause in a day.
  • Value stream mapping: A problem at one machine.

The methods in one line

MethodWhat it is
Supplier scorecardMonthly rating of quality (PPM), delivery (OTD) and response, with classes A / B / C.
Run at rateProduction trial at the quoted cycle time that proves the line can deliver the volume.
Kanban / pullReplenishes material by actual consumption with cards or signals and fixed limits.
8D reportTeam-based method for customer complaints: containment, root cause for occurrence and non-detection, verified corrective action, prevention.
Value stream mappingMaps material and information flow end to end and shows waiting, inventory and lead time.