First steps
- Self-assessment questionnaire.
- On-site audit of the critical areas.
- Decision with conditions and a development plan.
How to measure success
Assessment grade and launch PPM. Record the value before you start, so the effect of every action can be shown.
When these methods are the wrong choice
- Supplier assessment: Day-to-day performance tracking; use the scorecard.
- VDA 6.3 process audit: Quick shop-floor checks; use LPA.
- Run at rate: Quality problems without a capacity question.
- PPAP: Internal process problems.
- APQP: Problems in a running series process.
The methods in one line
| Method | What it is |
|---|---|
| Supplier assessment | Scores a supplier’s capability by area with knock-outs, as self-assessment or on-site audit. |
| VDA 6.3 process audit | Structured process audit with scored questions and EG grading, also used at suppliers. |
| Run at rate | Production trial at the quoted cycle time that proves the line can deliver the volume. |
| PPAP | Evidence package that the supplier’s process can make good parts at rate. |
| APQP | Five-phase launch plan with gates, so problems are prevented before SOP. |