DMAIC Control Phase Checklist and Project Closure

Check that an improvement project is ready to close: the result and the savings are confirmed, the process is under control with a control plan, standards are in place, people are trained and the process owner has taken over.How to use ↓
  • Free, no sign-up
  • Data stays in your browser
  • PDF report included

Part ofSix Sigma

Empty template

Fill in the form below, or load the sample to see a complete example and replace it with your own data.

  1. 1Enter or paste dataor click Load sample
  2. 2Read the verdictcharts and key figures
  3. 3Download the PDFwith your logo
Saved in this browser

Click OK, NOK or N/A for each item. A NOK opens fields for the finding and the immediate reaction.

Result

  • C1

    The project metric is at or better than the target for an agreed period (for example 4 to 8 weeks), shown with data.

  • C2

    The improvement is statistically confirmed (before / after test or a shifted control chart), not only visible in a few points.

  • C3

    The savings are confirmed by finance or controlling, separated into hard and soft savings.

Process control

  • C4

    The control plan includes the new or changed characteristics, process settings, methods, frequencies and reaction plans.

  • C5

    The key input or output is monitored with a control chart or an equivalent check, and out-of-control signals have a reaction.

  • C6

    Error-proofing or fixed settings replace the old reliance on attention wherever possible.

  • C7

    The PFMEA is updated with the verified causes and the new controls.

  • C8

    The measurement system for the controlled characteristics is validated (Gage R&R or attribute study).

Standards and people

  • C9

    Work instructions and standardised work describe the new method, at the station, in the current revision.

  • C10

    All shifts and stand-in operators are trained on the new method, with records.

  • C11

    The new standard is part of the layered process audit or the regular checks.

Handover and closure

  • C12

    The process owner has accepted the handover and knows the control plan, the monitoring and the reaction plan.

  • C13

    Open actions are listed with owner and due date and handed over.

  • C14

    Lessons learned are recorded and the solution is checked for transfer to similar processes and products.

  • C15

    The sponsor has signed off the project closure.

Photos (evidence)

Where this tool fits

DMAIC control phase checklist online

Check fifteen points at the Control tollgate of an improvement project: result and savings confirmed, control plan and monitoring, error-proofing, PFMEA, standards, training, handover and sponsor sign-off.

Every point marked not OK opens fields for the gap, the action, the owner and the due date, and the checklist is saved in your browser.

Worked example: DMAIC Control Phase Checklist

control tollgate of a Green Belt project.
  1. 01Resultconfirmed8 weeks of data
  2. 02Controlplan and SPCin place
  3. 03Gaps3 opensavings, LPA, sign-off
  4. 04Closewith sponsorafter the actions

01Method

The score is the share of applicable points rated OK, by section and in total.

PDF report in one click

Export a PDF with the score, the open points with actions and the full checklist.

Private: runs in your browser

All data stays in your browser. Nothing is uploaded and no account is needed.

How to use the checklist

  1. Go through it with the team two to four weeks before the planned closure.
  2. Mark each point OK or not OK with evidence.
  3. Plan the open points with owner and due date.
  4. Close with the sponsor when every point is OK.

Update the control plan, monitor with control charts and add the new standard to the layered process audit. The full roadmap: DMAIC step by step.

Frequently asked questions

›What is the Control phase for?

To make the improvement last: without control plan, monitoring, standards and a clear owner, most processes drift back to the old performance within months.

›How long should the result be confirmed before closing?

Long enough to see the normal variation of the process, typically four to eight weeks of data, or a defined number of lots for low-volume processes.

›Who decides that the project is closed?

The sponsor, at the Control tollgate, after the process owner has accepted the handover and the savings are confirmed.

›Can I change the checklist?

Yes. Use “Edit checklist” to add company-specific points such as customer notification or documentation requirements.