DMAIC control phase checklist online
Check fifteen points at the Control tollgate of an improvement project: result and savings confirmed, control plan and monitoring, error-proofing, PFMEA, standards, training, handover and sponsor sign-off.
Every point marked not OK opens fields for the gap, the action, the owner and the due date, and the checklist is saved in your browser.
Worked example: DMAIC Control Phase Checklist
- 01Resultconfirmed8 weeks of data
- 02Controlplan and SPCin place
- 03Gaps3 opensavings, LPA, sign-off
- 04Closewith sponsorafter the actions
01Method
The score is the share of applicable points rated OK, by section and in total.
PDF report in one click
Export a PDF with the score, the open points with actions and the full checklist.
Private: runs in your browser
All data stays in your browser. Nothing is uploaded and no account is needed.
How to use the checklist
- Go through it with the team two to four weeks before the planned closure.
- Mark each point OK or not OK with evidence.
- Plan the open points with owner and due date.
- Close with the sponsor when every point is OK.
Update the control plan, monitor with control charts and add the new standard to the layered process audit. The full roadmap: DMAIC step by step.
Frequently asked questions
›What is the Control phase for?
To make the improvement last: without control plan, monitoring, standards and a clear owner, most processes drift back to the old performance within months.
›How long should the result be confirmed before closing?
Long enough to see the normal variation of the process, typically four to eight weeks of data, or a defined number of lots for low-volume processes.
›Who decides that the project is closed?
The sponsor, at the Control tollgate, after the process owner has accepted the handover and the savings are confirmed.
›Can I change the checklist?
Yes. Use “Edit checklist” to add company-specific points such as customer notification or documentation requirements.