QM BenchQuality engineering tools

Checklist de auditoría 5S en línea con resultado por S y PDF

Recorra el área, califique cada punto de 0 a 4, registre hallazgos con acciones y obtenga el reporte. ↓

  1. 1Ingresar datos
  2. 2Leer el veredicto
  3. 3Descargar el reporte PDF

Nota: la interfaz de la herramienta está por ahora en inglés; la versión en español llegará pronto.

Saved in this browser

Score each item from 0 (not done) to 4 (fully in place and sustained). Items with 2 points or less open fields for the finding and the action. Click a selected score again to clear it.

Sort

  • S1

    Only items needed for the current work are in the area: no unused tools, parts, fixtures or old documents.

  • S2

    Unneeded items are removed or red-tagged, with a defined place and owner for the red-tag area.

  • S3

    Personal items, food and drinks are only in the places provided for them.

  • S4

    Quantities of material, consumables and spare parts at the workplace are limited to what is needed.

  • S5

    Defective, rework and obsolete parts are separated and clearly marked, not mixed with good parts.

Set in order

  • S6

    Every tool, gauge, fixture and container has a fixed, marked place (shadow board, label, floor marking).

  • S7

    Items used most often are within easy reach; heavy or rarely used items are stored further away.

  • S8

    Aisles, emergency exits, fire equipment and electrical panels are marked and free.

  • S9

    Min / max levels or reorder points are visible for material and consumables.

  • S10

    Gauges and measuring instruments are stored protected, identified and show their calibration status.

  • S11

    Material, work in progress and finished goods are identified and in marked locations.

Shine

  • S12

    Floors, machines, workbenches and shelves are clean, without oil, chips, dust or leaks.

  • S13

    Cleaning is part of the routine: a cleaning plan with responsibilities and the cleaning material is at hand.

  • S14

    Cleaning is also inspection: leaks, loose parts and wear found during cleaning are reported and repaired.

  • S15

    Sources of dirt (leaks, chips, dust) are identified and being eliminated, not only cleaned up.

  • S16

    Lighting, signs, labels and visual displays are clean, readable and working.

Standardize

  • S17

    The standards for the area are visible: reference photos, layout, colour code and 5S rules.

  • S18

    Colour coding, labels and markings follow one site-wide standard.

  • S19

    Responsibilities for 5S tasks (who, what, how often) are defined and displayed.

  • S20

    Work instructions and checklists at the workplace are current, controlled and match the 5S standard.

  • S21

    Visual management shows normal and abnormal conditions at a glance (e.g. fill level, min / max, status).

Sustain

  • S22

    Daily or weekly 5S checks are done and recorded by the team, not only before audits.

  • S23

    Previous audit findings are closed on time, with owner and due date.

  • S24

    People in the area were trained in 5S and can explain the rules and their own tasks.

  • S25

    5S results are displayed (score trend) and discussed in team meetings.

  • S26

    Management takes part in 5S walks and recognises good areas; improvements from the team are visible.

Photos (evidence)

Checklist de auditoría 5S en línea

Audite un área de trabajo según las cinco S: Clasificar, Ordenar, Limpiar, Estandarizar y Sostener. Califique 26 puntos de 0 a 4, vea el resultado por S en porcentaje y genere un reporte PDF.

Las 5S son la base del trabajo estándar y la gestión visual. Las auditorías regulares muestran dónde un puesto ordenado vuelve a las viejas costumbres.

Cómo funciona

Indique área, auditor y fecha, recorra el área y califique cada punto. Con 2 puntos o menos registre hallazgo, acción, responsable y fecha.

El dashboard muestra el resultado total y el de cada S en barras, así que la S más débil se ve de inmediato.

Cuándo usarla

Los equipos revisan su área cada semana en versión corta; supervisores e ingenieros de calidad auditan cada mes o trimestre. Un área nueva recibe una auditoría base antes del programa 5S.

Reporte PDF en un clic

Genere la auditoría 5S en PDF con encabezado, logotipo, resultado por S, hallazgos con acciones y checklist completo.

Privado: todo se ejecuta en su navegador

Todo se calcula y se guarda en su navegador. Contenidos, números de parte y fotos no se suben a ningún servidor. Sin registro ni instalación; puede descargar una copia de seguridad de todos sus datos cuando quiera.

Preguntas frecuentes

¿Qué significan las 5S?

Clasificar, Ordenar, Limpiar, Estandarizar y Sostener (en japonés Seiri, Seiton, Seiso, Seiketsu, Shitsuke).

¿Cómo se calcula el resultado?

Cada punto recibe de 0 a 4 puntos. El resultado es el porcentaje de los puntos posibles alcanzados, por S y en total. Los puntos N/A no cuentan.

¿Puedo cambiar las preguntas?

Sí, con “Edit checklist”.