First article inspection report online
Create a first article inspection report in the structure of the three AS9102 forms: part number accountability, raw materials and special processes with their certificates, and every ballooned characteristic of the drawing with its result and measuring tool.
Numeric characteristics are judged automatically against nominal and tolerance, attributes by an OK or NOK result. The verdict tells you whether the FAI is accepted, incomplete or rejected, and lists every characteristic out of specification.
Worked example: First Article Inspection
- 01Form 1part BR-2210 rev Dnew part
- 02Form 22 certificatesmaterial and anodising
- 03Form 37 pass, 1 fail, 1 openhole Ø8 H8 at 8.026
- 04Resultnot acceptedcorrect and repeat #3
01Method
A numeric result passes when it lies between nominal minus the lower tolerance and nominal plus the upper tolerance. Text requirements need a result that starts with OK or NOK. Characteristics without a result count as open.
The FAI is complete only when every listed characteristic has a valid result and none fails. A partial FAI lists only the characteristics affected by a change.
02When to use it
Use it for new parts, design or process changes, new suppliers and after long production breaks, for your own parts and to review FAI reports received from suppliers.
PDF report in one click
Export a landscape PDF with forms 1 to 3, the verdict and the results table.
Private: runs in your browser
Drawing data and results stay in your browser.
How to do an FAI
- Balloon the drawing: number every dimension, tolerance, note and specification.
- Fill in form 1: part, revision, drawing, organisation, reason, full or partial.
- List materials and special processes with their specifications and certificates (form 2).
- Measure every characteristic and enter the result and the tool (form 3).
- Disposition every failure and repeat the FAI for those characteristics after correction.
Record nonconformities in the NCR tracker; for automotive approval use the PPAP checklist. All tools: quality inspection.
Frequently asked questions
›What is a first article inspection?
A complete, documented check of the first part from a new or changed production process against every requirement of the drawing and the purchase order. It proves that the process can make the part as designed.
›What are the three AS9102 forms?
Form 1 covers part number accountability (part, revision, organisation, reason). Form 2 covers raw materials, special processes and functional tests with their certificates. Form 3 lists every design characteristic with its requirement, result and the tool used.
›When is a new FAI required?
Typically for a new part, a design change affecting form, fit or function, a change of process, location or supplier, and after a production break of two years. Partial FAIs cover only the characteristics affected by the change.
›Is FAI the same as PPAP?
Both prove that production can make the part, but PPAP (automotive) adds capability studies, MSA, PFMEA, control plan and a run at rate, while FAI (aerospace and general industry) focuses on the complete dimensional and material verification of the first part.