Heijunka
levelling of volume and product mix
Heijunka levels production by volume and by product mix over a period, instead of producing large batches of one product after the other. A heijunka box distributes kanban cards in time slots across the shift.
Levelling needs short changeovers: the more often a process can change over, the smaller the batches and the more even the load on upstream processes and suppliers. EPEI (every part every interval) measures how often each part can be produced.
Calculate it
Kanban Calculator: Number of kanban cards, maximum stock and days of coverage per part.
Related terms
- Kanban: card signal for pull replenishment
- SMED (single-minute exchange of die): quick changeover method
- Takt time: pace of customer demand