The 8 wastes of lean (TIMWOODS) with shop floor examples
The eight wastes of lean manufacturing: transport, inventory, motion, waiting, overproduction, overprocessing, defects and unused skills, with examples, countermeasures, mura and muri.
Lean looks at every process through the eyes of the customer: only work that changes the product in a way the customer is willing to pay for adds value. Everything else is waste (muda in Japanese) or, at best, necessary for now. In a typical factory less than 5 % of the lead time is value adding. The rest is waiting, moving and storing.
The eight wastes are a checklist for seeing that waste on the shop floor. They are often remembered as TIMWOODS: transport, inventory, motion, waiting, overproduction, overprocessing, defects and skills.
The eight wastes with examples
| Waste | What it is | Shop floor example | Typical countermeasure |
|---|---|---|---|
| Transport | Moving material, parts or information without changing them. | Forklift trips between buildings, parts carried to a central inspection. | Layout by flow, point-of-use storage, smaller and closer supermarkets. |
| Inventory | Material waiting between steps, more than the next step needs. | Full racks before every machine, finished goods for months. | Kanban with a fixed number of cards, smaller batches, shorter changeovers. |
| Motion | Movement of people that adds no value. | Walking to the tool cart, bending, searching for screws. | 5S, point-of-use tools and parts, ergonomic station design. |
| Waiting | People or machines idle while waiting for material, information or a decision. | Operator watches the machine cycle, line waits for first-part approval. | Line balancing to takt, quick response to andon calls, SMED. |
| Overproduction | Making more, or earlier, than the next process or customer needs. | Building to forecast, running a machine “because it is set up”. | Pull systems, production to takt, levelling (heijunka). |
| Overprocessing | More work or precision than the customer pays for. | Tighter tolerances than the function needs, double inspections, reports nobody reads. | Question every step against the customer requirement, CTQ review. |
| Defects | Scrap, rework, sorting, complaints and warranty. | Rework station at the end of the line, 100 % sorting of a supplier part. | Root cause analysis, poka-yoke, SPC, capable processes. |
| Skills | Not using the knowledge, ideas and abilities of people. | Operators who know the cause of a problem but are never asked. | Daily improvement routines, suggestion systems, problem solving training. |
Why overproduction is the worst
Making too much or too early creates most of the other wastes: the extra parts must be transported, stored, counted and protected, and defects in them stay hidden until somebody uses them, sometimes weeks later. That is why lean puts pull and takt before everything else.
Mura and muri
Toyota names two more sources of waste. Mura is unevenness: a schedule that swings between overtime and idle time. Muri is overburden: people or machines pushed beyond a reasonable load. Both cause muda, so levelling the work and keeping loads reasonable is part of removing waste.
How to find waste in practice
- Go to the gemba with the list and watch one product or one operator for a full cycle.
- Mark each step as value adding, necessary non-value adding or waste.
- Put the times into a Yamazumi chart with the takt time calculator; the waste becomes a red block per station.
- Start with the biggest block at the bottleneck station.
For the whole flow from supplier to customer, draw a value stream map. More tools are in the lean hub.