QM BenchQuality engineering tools

Tier meetings and the SQCDP board: shop floor management guide

How to run tier 1 to 3 meetings and an SQCDP board: KPI per letter, meeting cascade, standard agenda, escalation rules and common mistakes.

Ľubomír Blažek
Process quality team leader, automotive · updated 2026-11-14
PremiumFPY & RTY Tracker PRO · ready-made Excel · €5.90

Tier meetings and an SQCDP board are the core of shop floor management: a daily routine in which every team looks at its results, agrees actions for every deviation and escalates what it cannot solve. Done well, a problem at the line reaches the right decision maker within hours. Done badly, it becomes another meeting.

The SQCDP board

One column per letter: Safety, Quality, Cost, Delivery, People. Each column shows one or two KPI the team can influence, a target, and the result of each day of the month, often as the letter itself filled in green or red. Below the board: an action list with owner and due date, and a problem-solving sheet for repeat issues.

LetterTypical KPI at the lineFree tool to calculate it
SAccidents, near misses, open safety actions–
QFirst pass yield, internal defects, customer complaintsFPY / RTY, Pareto
CScrap cost, productivity, overtime hoursCOPQ
DPlan fulfilment, OEE, backlogOEE
PAttendance, training plan, ideas submitted–

The meeting cascade

  • Tier 1, at the line, 10 to 15 minutes at shift start: team leader and operators. Yesterday’s results, today’s plan, problems and help needed.
  • Tier 2, 15 to 20 minutes: supervisors with quality, maintenance and logistics. Walk the tier 1 boards, take over escalations, assign support.
  • Tier 3, 20 to 30 minutes: plant management with department heads. Plant KPI, escalations from tier 2, decisions on resources.

A standard agenda

  1. Safety first: any incident or near miss since the last meeting.
  2. Each letter of the board: green or red, and for red, the reason and the action.
  3. Open actions: due today, overdue, done.
  4. Escalations: what goes up to the next tier, and what came down as an answer.

Escalation rules

Agree in advance which problem goes up after how long, for example: a line stop over 30 minutes to tier 2 at once, a customer complaint to tier 3 the same day, a repeated red day to a structured problem solving with 5 Why or an 8D. Write the rules on the board.

Common mistakes

  • Too many KPI, updated weekly from the office instead of daily by the team.
  • Solving problems in the meeting instead of assigning them.
  • Managers who attend tier 3 but never walk the tier 1 boards.
  • Reacting to every red day: look at trends, a control chart separates noise from signals.

Check that the standards behind the board are followed with layered process audits. More in the shop floor management hub.