Line cannot keep up with demand: which quality tools to use

Output falls short of the customer schedule; overtime and extra shifts become normal.

Start with

Supporting methods

First steps

  1. Calculate takt from demand and available time.
  2. Time each station and draw the Yamazumi chart.
  3. Remove waste at the bottleneck, then rebalance.

How to measure success

Output per shift against demand, and overtime hours. Record the value before you start, so the effect of every action can be shown.

When these methods are the wrong choice

  • Takt time and line balancing: Job shops where every order has a different routing.
  • OEE analysis: Manual processes without a machine cycle.
  • SMED: Lines that rarely change over.
  • Standard work / work instruction: Processes that are still changing every week.
  • 5S: Process capability problems.

The methods in one line

MethodWhat it is
Takt time and line balancingSets the pace from customer demand and spreads the work evenly over the stations (Yamazumi chart).
OEE analysisSplits equipment losses into availability, performance and quality to show where time is lost.
SMEDShortens changeovers by moving work outside the machine stop and simplifying the rest.
Standard work / work instructionThe current best way to do a job, with key points and reasons, used for training and audits.
5SWorkplace organisation: sort, set in order, shine, standardise, sustain.

Other problems in Production