First steps
- Calculate takt from demand and available time.
- Time each station and draw the Yamazumi chart.
- Remove waste at the bottleneck, then rebalance.
How to measure success
Output per shift against demand, and overtime hours. Record the value before you start, so the effect of every action can be shown.
When these methods are the wrong choice
- Takt time and line balancing: Job shops where every order has a different routing.
- OEE analysis: Manual processes without a machine cycle.
- SMED: Lines that rarely change over.
- Standard work / work instruction: Processes that are still changing every week.
- 5S: Process capability problems.
The methods in one line
| Method | What it is |
|---|---|
| Takt time and line balancing | Sets the pace from customer demand and spreads the work evenly over the stations (Yamazumi chart). |
| OEE analysis | Splits equipment losses into availability, performance and quality to show where time is lost. |
| SMED | Shortens changeovers by moving work outside the machine stop and simplifying the rest. |
| Standard work / work instruction | The current best way to do a job, with key points and reasons, used for training and audits. |
| 5S | Workplace organisation: sort, set in order, shine, standardise, sustain. |