Gemba Walk Checklist with Findings, Actions and PDF

Walk the shop floor with a clear structure: safety, standard work, flow, quality, workplace and the team board. Record what you see, agree actions on the spot and follow them up next time.How to use ↓
  • Free, no sign-up
  • Data stays in your browser
  • PDF report included

Part ofShop floor management

Empty template

Fill in the form below, or load the sample to see a complete example and replace it with your own data.

  1. 1Enter or paste dataor click Load sample
  2. 2Read the verdictcharts and key figures
  3. 3Download the PDFwith your logo
Saved in this browser

Click OK, NOK or N/A for each item. A NOK opens fields for the finding and the immediate reaction.

Safety

  • G1

    People wear the required protective equipment and walkways are free.

  • G2

    Open safety actions from the board are being worked on; nobody has to work around a known hazard.

Standard work

  • G3

    The current standard (work instruction, standardised work sheet) is at the station and matches the part.

  • G4

    Observed cycle follows the standard sequence; deviations have a reason the operator can explain.

  • G5

    The operator can explain the key points and reasons of the job, and whom to call when something is abnormal.

Flow and pace

  • G6

    The line runs to plan; the hour-by-hour or output board is up to date and gaps have a recorded reason.

  • G7

    Work in progress between stations is within the agreed limits (kanban, marked squares).

  • G8

    Nobody waits, walks or searches for material, tools or information during the observed cycle.

Quality

  • G9

    Checks from the control plan are done at the right frequency and recorded; abnormal results have a reaction.

  • G10

    Nonconforming parts are identified and separated in a red box or area, nothing is waiting without a decision.

  • G11

    Gauges at the station are calibrated and stored in their place.

Workplace and equipment

  • G12

    The area meets the 5S standard: only needed items, everything in its marked place, clean.

  • G13

    Machines show no leaks, unusual noise or temporary repairs; abnormalities are tagged.

Board and people

  • G14

    The SQCDP board is updated for today and every red item has an action with owner and date.

  • G15

    Escalated problems got an answer within the agreed time.

  • G16

    The team has raised an improvement idea or problem since the last walk, and it got feedback.

Photos (evidence)

Gemba walk checklist online

Go to the shop floor with a structure: sixteen points on safety, standard work, flow and pace, quality, workplace and equipment, and the team board. Mark each point OK, not OK or not applicable, record what you saw and agree an action with owner and due date on the spot.

The questions can be edited or extended for your plant, and the walk is saved in your browser so you can follow up the actions on the next walk.

Worked example: Gemba Walk Checklist

plant manager on assembly line 2.
  1. 01Walk16 pointssafety to board
  2. 02Observe1 cycleat each station
  3. 03Findings2 NOKwalking, red days without action
  4. 04Follow up2 actionsowner and date

01Method

The result is the share of applicable points rated OK, by section and in total. Every point rated not OK opens fields for the finding, the immediate reaction or action, the owner and the due date, and appears in the findings list of the report.

02When to use it

Use it for regular management walks on the shop floor, to prepare a gemba walk with a clear focus, and to follow up the actions from earlier walks.

PDF report in one click

Export the walk as a PDF with the header, the score by section, all findings with actions and the full checklist.

Private: runs in your browser

Your walks are stored in your browser only.

How to do a gemba walk

  1. Pick a purpose: one line, one problem, or the follow-up of last week’s actions.
  2. Go and watch at least one full cycle at each station before you ask anything.
  3. Ask open questions: “What makes this job hard?”, “What happens when the part does not fit?”
  4. Check the standard and the board with the points of the checklist.
  5. Agree actions on the spot with owner and date, and thank the team.
  6. Come back to check the actions on the next walk.

Short daily checks of key process points by all levels are the job of the layered process audit; the walk itself looks at the whole system. More in the shop floor management hub and the glossary entry gemba.

Frequently asked questions

›What is a gemba walk?

A manager goes to the real place where the work is done, watches the actual process, asks the people who do it and checks the standard. Gemba is Japanese for “the real place”.

›How is a gemba walk different from an audit?

An audit checks compliance and produces a score. A gemba walk is about understanding and support: removing obstacles, clarifying standards and learning how the work really runs. This checklist gives the walk a structure, but the conversation matters more than the score.

›How often should managers walk?

Team leaders and supervisors daily, department managers several times a week, plant managers at least weekly. Short and regular beats long and rare.

›Can I change the questions?

Yes. Edit, add or remove questions with “Edit checklist”, for example to focus a walk on one topic such as safety or changeovers.