SQCDP board online, free and printable
Run the daily board of a team in the browser: one row each for safety, quality, cost, delivery and people, a KPI and target per letter, and every day of the month marked green or red with one click. Below the board, an action list with owner, due date and status.
The board flags letters that have been red several days in a row and red letters without an open action, counts overdue actions and prints as an A3 landscape sheet for the wall next to the line.
Worked example: SQCDP Board
- 01Set KPI5 lettersone KPI and target each
- 02Mark daysgreen / redone click per day
- 03Act4 actionsowner and due date
- 04EscalateQ red 3 daysto the next tier
01Method
A day is green when the KPI met its target and red when it did not. The share of green days, the longest red run and the current red run are calculated per letter. A red run at or above the escalation limit (3 days by default) is flagged for escalation to the next tier.
Actions are open until ticked as done; an open action is overdue when its due date is before today, or before the end of the month for a past month.
02When to use it
Use it as the digital or printed tier 1 board of a line, cell or department, as a template when introducing shop floor management, and to review a month of results in the tier 2 or tier 3 meeting.
PDF report in one click
Export the month as a landscape PDF: the board with green and red days, the KPI and targets, the verdict and the action list with status.
Private: runs in your browser
The board is saved in your browser only. Nothing is uploaded.
How to use the board
- Pick one KPI per letter that the team can influence, with a clear target and a rule for green and red.
- Mark yesterday at the start of the shift, in the tier 1 meeting, together with the team.
- Write an action for every red day: problem, action, owner, due date.
- Escalate letters that stay red, at the next tier meeting.
- Review the month in tier 2 or 3: share of green days per letter, repeated reds, overdue actions.
Example
Assembly line 2 marks the first 14 days of November. Quality has been red for three days in a row because of scratches on cover 4715; the board asks for escalation and the quality engineer starts a Pareto and a 5 Why. Delivery was red on two days after a press breakdown; the action is done and the letter is green again.
Plan the meeting cascade with the tier meeting planner, link the KPI to the plant goals with the KPI tree and read the guide to tier meetings and SQCDP boards. All tools: shop floor management.
Frequently asked questions
›What does SQCDP stand for?
Safety, Quality, Cost, Delivery and People. Each letter is one column or row of the board with one KPI the team can influence, a target and the result of every day.
›When is a day green or red?
Green when the KPI met its target that day, red when it did not. Agree the rule per letter in advance, for example “red = any accident or near miss” for safety or “red = plan fulfilment below 98 %” for delivery.
›Why escalate after three red days?
One red day can be noise; several in a row show a problem the team cannot solve alone. Three is a common rule; set your own limit in the tool and write it on the board.
›Can I print the board?
Yes. The PDF is a landscape page with the month, the green and red days, the KPI and targets and the action list. Print it on A3 for the wall next to the line.
›Is my board saved?
It is saved in your browser and you can keep several boards as projects. Nothing is uploaded; use the share link or the PDF to pass it on.